Preparation for the production of the new Porsche model series Panamera is running at high speed: Today, Dr. Ing. h.c. F. Porsche AG, Stuttgart celebrated its topping out ceremony for the further expansion of its Leipzig plant. Among those present included German Federal Minister of Transport Wolfgang Tiefensee, the Minister President of Saxony Georg Milbradt, Leipzig’s mayor Burkhard Jung and the Porsche Executive Board member Michael Macht as well as 300 guests and construction workers who together placed a garland on the roof of the new Panamera production facilities. With an area of 25,000 square meters, the facilities form the basis of the expansion. An adjacent logistics center with an area of 23,500 square meters has also been created. In addition, the existing assembly facilities, in which the Cayenne is already being manufactured, will be expanded to include a pilot and analysis center as well as an apprentice workshop. In total, investments for the buildings and production equipment amounted to 150 million Euro.
Previous article
Porsche Cayenne S Transsyberia: factory-built rally machine